Roadworks in the Hammersmith Area

Where to expect traffic delays in the days ahead

Related Links

Roadworks

Live Travel News for Hammersmith

Participate
Sign up for our free weekly newsletter

Comment on this story on the

Roadworks

A3220 Holland Road, London, Kensington And Chelsea
06 February — 07 February
Delays likely Lane closure
Works location: A3220
Works description: Maintenance - Pothole Area 0.5m Sq. Part Lane Closure
Responsibility for works: Transport For London
Current status: Planned work about to start
A3220 Warwick Road, London, Kensington And Chelsea
06 February — 07 February
Delays likely Lane closure
Works location: A3220
Works description: Maintenance - Coring Investigation Lane 1
Responsibility for works: Transport For London
Current status: Planned work about to start
A3220 Warwick Road, London, Kensington And Chelsea
06 February — 15 February
Delays likely Lane closure
Works location: A3220
Works description: Connections Projects:Cable Laying: (Approx Depth 450mm-600mm):Exc Joint Hole In Fw O/S 185, 195 And Opposite Warwick Arms (Ph), Also Excavate In The Fw And Cw Outside Durrels House
Responsibility for works: UK Power Networks
Current status: Planned work about to start
A219 Fulham Palace Road, London, Hammersmith And Fulham
07 February — 10 February
Delays possible Some carriageway incursion
Works location: A219
Works description: Remedial Ha Defect To Redo Fillet
Responsibility for works: BT
Current status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
07 February — 10 February
Delays possible Some carriageway incursion
Works location: A3218
Works description: Remedial Ha Defect To Redo Fillet
Responsibility for works: BT
Current status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
06 February — 10 February
Delays possible Some carriageway incursion
Works location: B317
Works description: Locate And Excavate 1 Blockage In Existing Duct,Locate And Excavate 1 Subsequent Blockage In Existing Duct
Responsibility for works: BT
Current status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
06 February — 10 February
Delays possible Some carriageway incursion
Works location: B317
Works description: Locate And Excavate 1 Blockage In Existing Duct,Locate And Excavate 1 Subsequent Blockage In Existing Duct In Footway
Responsibility for works: BT
Current status: Planned work about to start
St Peter'S Road, London, Hammersmith And Fulham
07 February — 08 February
Delays possible Some carriageway incursion
Works location: -
Works description: -
Responsibility for works: UK Power Networks
Current status: Planned work about to start

 

Information supplied by Roadworks.org

 

 

Bookmark and Share