A219 Butterwick, London, Hammersmith And Fulham
19 June — 23 June Lane closure
Delays likely due to Streetworks
Excavation - Replacement Of Existing Telecommunications Mast. Day 1 Install New Ductwork With Pedestrian Manaement. Day 2 (Sunday)Swap Existing Telecomms Mast With New Mast Using Hiab, Lane Closure In Operation. Day 3 Complete Works And Reinstate Site at A219
Responsibility: T-Mobile (UK)Limited
EToN status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
20 June — 20 June Traffic control (two-way signals)
Delays likely due to Streetworks
To Exchange Faulty Pump In Manhole Chamber. No Excavation at A3218
Responsibility: Thames Water
EToN status: Planned work about to start
A4 Talgarth Road, London, Hammersmith And Fulham
19 June — 21 June Lane closure
Delays likely due to Streetworks
Repair To A Damaged Thames Water Main In Footway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at A4
Responsibility: Thames Water
EToN status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
20 June — 21 June Traffic control (multi-way signals)
Delays likely due to Streetworks
Repair To A Damaged Thames Water Main In Carriageway. Our Intention Isto Complete The Permanent Reinstatement In The Same Phase at B317
Responsibility: Thames Water
EToN status: Planned work about to start
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham
20 June — 21 June Some carriageway incursion
Delays possible due to Streetworks
2xdisconnections In Carriageway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
B316 Pembroke Road, London, Kensington And Chelsea
20 June — 24 June Some carriageway incursion
Delays possible due to Streetworks
Clear Blockage In Carriageway at B316
Responsibility: Virgin Media
EToN status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
19 June — 22 June Some carriageway incursion
Delays possible due to Streetworks
Excavation Trial Hole To Determine Whether Services In Proposed Location Of New Ctil Pole. No Traffic Flow Issues. Vehicle To Be Parked Safely, Either Off Road Or Around Corner. Peds - Chapter 8 Barriers - 1.2m Gap For Wheelchair And Mobility Scooter Access at B317
Responsibility: Vodafone Group
EToN status: Planned work about to start
B408 Askew Road, London, Hammersmith And Fulham
20 June — 23 June Some carriageway incursion
Delays possible due to Streetworks
Customer Connection New Residential Supply & Clear Blockages If Found. Footway Works Only at B408
Responsibility: Virgin Media
EToN status: Planned work about to start
Greyhound Road, London, Hammersmith And Fulham
19 June — 22 June Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: BT
EToN status: Planned work about to start

 