Roadworks in the Hammersmith Area

Where to expect traffic delays in the days ahead

Related Links

Roadworks

Live Travel News for Hammersmith

Participate
Sign up for our free weekly newsletter

Comment on this story on the
A219 Queen Caroline Street, London, Hammersmith And Fulham
26 August — 26 August Lane closure
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham
25 August — 27 August Road closure
Delays likely due to Streetworks
Carriageway Resurfacing & Lining at A219
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
A402 Goldhawk Road, London, Hammersmith And Fulham
26 August — 27 August Lane closure
Delays likely due to Streetworks
Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling Works In Existing Duct And Box Cleaning. Required For New Customer Connection. at A402
Responsibility: BT
EToN status: Planned work about to start
A402 Holland Park Avenue, London, Kensington And Chelsea
25 August — 26 August Lane closure
Delays likely due to Streetworks
11/091 Tel35464 - Access Pole 27, Green Aspect Out And Pole 26 Red Aspect Out On 6m Pole, 22:00-05:00, Ped Access Maintained. at A402
Responsibility: Transport For London
EToN status: Planned work about to start
A219 Queen Caroline Street, London, Hammersmith And Fulham
26 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (915mm X 445mm) In Footway at A219
Responsibility: BT
EToN status: Planned work about to start
A315 Chiswick High Road, Chiswick, London, London Borough Of Hounslow
26 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct In F/W at A315
Responsibility: BT
EToN status: Planned work about to start
A4 Talgarth Road, London, Hammersmith And Fulham
26 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
Signals - Traffic Signal Works F/Way: Trial Hole For Mast Arm Position at A4
Responsibility: Transport For London
EToN status: Planned work about to start
Crabtree Lane, London, Hammersmith And Fulham
26 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Greyhound Road, London, Hammersmith And Fulham
25 August — 26 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Virgin Media
EToN status: Planned work about to start
Pennard Road, London, Hammersmith And Fulham
26 August — 27 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Virgin Media
EToN status: Planned work about to start
Sinclair Road, London, Hammersmith And Fulham
26 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: UK Power Networks
EToN status: Planned work about to start
St Dunstan'S Road, London, Hammersmith And Fulham
25 August — 01 September Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: National Grid Gas Plc
EToN status: Planned work about to start
Upper Addison Gardens, London, Kensington And Chelsea
26 August — 26 August Traffic control (Stop/Go boards)
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Weltje Road, London, Hammersmith And Fulham
25 August — 28 August Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start

 

 

Information supplied by Roadworks.org

 

August 25, 2015

 

 

Bookmark and Share