Roadworks in the Hammersmith Area

Where to expect traffic delays in the days ahead

Related Links

Roadworks in the Hammersmith Area

Live Travel News for Hammersmith

Participate
Sign up for our free weekly newsletter

Comment on this story on the

Road closures underneath Hammersmith Flyover

Centre Access Road
Road closure, 10.30pm - 5am, 18 September

Eastern Access Road
Road closure, 10.30pm - 5am, 18 Sept

Emergency works on Hammersmith Bridge

Closed southbound from 8am to 4pm daily, from Monday 21 September to Friday 25 September.

 

A315 Hammersmith Road, London, Hammersmith And Fulham
19 September — 21 September Lane closure
Delays likely due to Streetworks
Repair To A Damaged Network Valve In Carriageway. Our Intention Is To Complete The Permanent Reinstatement In The Same Phase at A315
Responsibility: Thames Water
EToN status: Planned work about to start
A4 Talgarth Road, London, Hammersmith And Fulham
18 September — 20 September Lane closure
Delays likely due to Streetworks
Repair To A Damaged Thames Water Main In Footway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at A4
Responsibility: Thames Water
EToN status: Planned work about to start
Hammersmith Grove, London, Hammersmith And Fulham
19 September — 02 October Lane closure
Delays likely due to Streetworks
- at -
Responsibility: euNetworks
EToN status: Planned work about to start
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham
18 September — 22 September Some carriageway incursion
Delays possible due to Streetworks
Service Pipe Repair In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A306 Hammersmith Bridge Road, London, Hammersmith And Fulham
18 September — 22 September Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at A306
Responsibility: BT
EToN status: Planned work about to start
A3220 Addison Road, London, Kensington And Chelsea
18 September — 19 September Some carriageway incursion
Delays possible due to Streetworks
Maintenace: Relay- 8 Uneven 600 Slabs Area 2.88m Sq. Part F/W Part Lane 1 at A3220
Responsibility: Transport For London
EToN status: Planned work about to start
A3220 Holland Road, London, Kensington And Chelsea
18 September — 19 September Some carriageway incursion
Delays possible due to Streetworks
Maintenace: 10/15 Broken Paving Slabs. Part F/W Part Lane 1 at A3220
Responsibility: Transport For London
EToN status: Planned work about to start
A4020 Uxbridge Road, London, Hammersmith And Fulham
18 September — 22 September Some carriageway incursion
Delays possible due to Streetworks
W.R.P. - Remove Non Ad Bus Shelter, Back Of Path, For And On Behalf Of Transport For London- 0113/1011 2323356 at A4020
Responsibility: London Transport
EToN status: Planned work about to start
A4020 Uxbridge Road, London, Hammersmith And Fulham
19 September — 22 September Some carriageway incursion
Delays possible due to Streetworks
Customer Connection New Residential Supply & Clear Blockages If Found. Footway Works Only at A4020
Responsibility: Virgin Media
EToN status: Planned work about to start
Bramber Road, London, Hammersmith And Fulham
19 September — 22 September Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Virgin Media
EToN status: Planned work about to start
Palliser Road, London, Hammersmith And Fulham
18 September — 22 September Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Virgin Media
EToN status: Planned work about to start
Silverton Road, London, Hammersmith And Fulham
18 September — 22 September Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
St Peter'S Road, London, Hammersmith And Fulham
19 September — 23 September Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: UK Power Networks
EToN status: Planned work about to start

 

 


Information supplied by Roadworks.org

 

September 18, 2015

Bookmark and Share