Roadworks in the Hammersmith Area

Where to expect traffic delays in the days ahead

 

Related Links

Roadworks in the Hammersmith Area

Live Travel News for Hammersmith

Participate
Sign up for our free weekly newsletter

Comment on this story on the
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham
13 October — 15 October Lane closure
Delays likely due to Streetworks
Repair To A Damaged Water Main In Footway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A3218 Lillie Road, London, Hammersmith And Fulham
12 October — 14 October Traffic control (multi-way signals)
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A3218
Responsibility: Thames Water
EToN status: Planned work about to start
A219 Fulham Palace Road, London, Hammersmith And Fulham
12 October — 14 October Some carriageway incursion
Delays possible due to Streetworks
Boundary Box Exchange In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A219
Responsibility: Thames Water
EToN status: Planned work about to start
A306 Hammersmith Bridge Road, London, Hammersmith And Fulham
13 October — 15 October Some carriageway incursion
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct In F/W at A306
Responsibility: BT
EToN status: Planned work about to start
A315/B408 Glenthorne Road, London, Hammersmith And Fulham
13 October — 15 October Some carriageway incursion
Delays possible due to Streetworks
Install 2m Of 1 Way Poly Duct In Footway at A315/B408
Responsibility: BT
EToN status: Planned work about to start
A3219 Dawes Road, London, Hammersmith And Fulham
13 October — 15 October Some carriageway incursion
Delays possible due to Streetworks
W.R.P. - Installation Of Foundations In Preparation For A Bus Stop Post, For And On Behalf Of Transport For London . Bus Stop Number:- 11246 2376546 at A3219
Responsibility: London Transport
EToN status: Planned work about to start
A3220 Warwick Road, London, Kensington And Chelsea
12 October — 13 October Some carriageway incursion
Delays possible due to Streetworks
Maintenance - Sunken Gulley Part F/Way, Part Lane 1 at A3220
Responsibility: Transport For London
EToN status: Planned work about to start
A402 Goldhawk Road, London, Hammersmith And Fulham
12 October — 14 October Some carriageway incursion
Delays possible due to Streetworks
Customer Side Leakage Repair at A402
Responsibility: Thames Water
EToN status: Planned work about to start
A4 West Cromwell Road, London, Kensington And Chelsea
12 October — 14 October Some carriageway incursion
Delays possible due to Streetworks
Excavate And Install New Fw Chamber On Existing Network And 20m 1x54mm Duct For New Customer Connection at A4
Responsibility: Verizon Business
EToN status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
12 October — 12 October Some carriageway incursion
Delays possible due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Replace Link Box - Repair Fillet As Per Inspection - No Jsm Required at B317
Responsibility: UK Power Networks
EToN status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
12 October — 13 October Some carriageway incursion
Delays possible due to Streetworks
Surfacing Carriageway at B317
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
12 October — 16 October Some carriageway incursion
Delays possible due to Streetworks
Connections Highway Services:Works For Road Purposes: (Notice For Information Only):Transfer Of Service To L/C On Behalf Of Lbhf at B317
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
12 October — 16 October Some carriageway incursion
Delays possible due to Streetworks
Connections Highway Services:Works For Road Purposes: (Notice For Information Only):Electrical Connection On Behalf Of Lbhf at B317
Responsibility: Hammersmith and Fulham London Borough Council
EToN status: Planned work about to start
B317 North End Road, London, Hammersmith And Fulham
13 October — 15 October Some carriageway incursion
Delays possible due to Streetworks
Install New Tee In Carriageway And Footway To Connect New Client at B317
Responsibility: Virgin Media
EToN status: Planned work about to start
Crabtree Lane, London, Hammersmith And Fulham
12 October — 16 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: UK Power Networks
EToN status: Planned work about to start
Crabtree Lane, London, Hammersmith And Fulham
13 October — 15 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Thames Water
EToN status: Planned work about to start
Pennard Road, London, Hammersmith And Fulham
13 October — 14 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Virgin Media
EToN status: Planned work about to start
Pennard Road, London, Hammersmith And Fulham
13 October — 14 October Some carriageway incursion
Delays possible due to Streetworks
- at -
Responsibility: Virgin Media
EToN status: Planned work about to start

 

 


Information supplied by Roadworks.org

 

October 12, 2015

Bookmark and Share