Roadworks in the Hammersmith Area

Where to expect traffic delays in the days ahead

 

Related Links

Roadworks in the Hammersmith Area

Live Travel News for Hammersmith

Participate
Sign up for our free weekly newsletter

Comment on this story on the

 

A219 Shepherd's Bush Road, London, Hammersmith And Fulham

12 December — 12 December Contra-flow

Delays likely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at A219

Responsibility: BT

EToN status: Planned work about to start

A315 King Street, London, Hammersmith And Fulham

11 December — 14 December Some carriageway incursion

Delays possible due to Streetworks
Remedial Reinstatement - Replacing Slabs at A315

Responsibility: BT

EToN status: Planned work about to start

B408 Dalling Road, London, Hammersmith And Fulham

11 December — 15 December Some carriageway incursion

Delays possible due to Streetworks
Boundary Box Adjust In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at B408

Responsibility: Thames Water

EToN status: Planned work about to start

Blythe Road, London, Hammersmith And Fulham

11 December — 14 December Some carriageway incursion

Delays possible due to Streetworks
- at -

Responsibility: Thames Water

EToN status: Planned work about to start

 

 

 


Information supplied by Roadworks.org

 

December 11, 2015

Bookmark and Share