Roadworks in the Hammersmith Area

Where to expect traffic delays in the days ahead

 

Related Links

Roadworks in the Hammersmith Area

Live Travel News for Hammersmith

Participate
Sign up for our free weekly newsletter

Comment on this story on the

A219 Fulham Palace Road, London, Hammersmith And Fulham

05 January — 11 January Lane closure

Delays likely due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Nw London High Risk Link Box Replacement 2016 at A219

Responsibility: UK Power Networks

EToN status: Planned work about to start

A219 Shepherd's Bush Road, London, Hammersmith And Fulham

04 January — 05 January Lane closure

Delays likely due to Streetworks
Interim To Permanent Reinstatement In The Carriageway at A219

Responsibility: Virgin Media

EToN status: Planned work about to start

A219 Shepherd's Bush Road, London, Hammersmith And Fulham

05 January — 05 January Contra-flow

Delays likely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at A219

Responsibility: BT

EToN status: Planned work about to start

A306 Castelnau, Barnes, Richmond Upon Thames

05 January — 05 January Lane closure

Delays likely due to Streetworks
Replace Sewer Cover--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A306

Responsibility: Thames Water

EToN status: Planned work about to start

A3220 Warwick Road, London, Kensington And Chelsea

05 January — 06 January Lane closure

Delays likely due to Streetworks
Maintenance - Make Safe Leaning Electrical Post And Sign Damaged Lane 1 at A3220

Responsibility: Transport For London

EToN status: Planned work about to start

A4 Hammersmith Flyover, London, Hammersmith And Fulham

05 January — 06 January Road closure

Delays likely due to Streetworks
Cyclical Routine Maintenance And Epa Duties Full Closure & Diversions E/B at A4

Responsibility: Transport For London

EToN status: Planned work about to start

A4 Hammersmith Flyover, London, Hammersmith And Fulham

05 January — 06 January Road closure

Delays likely due to Streetworks
Cyclical Routine Maintenance And Epa Duties Lane 3 W/B at A4

Responsibility: Transport For London

EToN status: Advanced planning

A4 West Cromwell Road, London, Hammersmith And Fulham

05 January — 06 January Lane closure

Delays likely due to Streetworks
Cyclical Routine Maintenance And Epa Duties Lanes 2&3 E/B. at A4

Responsibility: Transport For London

EToN status: Advanced planning

A4 West Cromwell Road, London, Kensington And Chelsea

05 January — 06 January Lane closure

Delays likely due to Streetworks
Cyclical Routine Maintenance And Epa Duties Lanes 2&3 E/B. at A4

Responsibility: Transport For London

EToN status: Advanced planning

Blythe Road, London, Hammersmith And Fulham

04 January — 12 January Traffic control (two-way signals)

Delays likely due to Streetworks
- at -

Responsibility: BT

EToN status: Planned work about to start

 

 

 

 

 


Information supplied by Roadworks.org

 

January 4, 2016

Bookmark and Share