Upcoming Roadworks in the Hammersmith Area

Where to expect traffic delays in the days ahead

Related Links

Roadworks in the Hammersmith Area

Live Travel News for Hammersmith

Participate
Sign up for our Hammersmith newsletter

Comment on this story on the

A4 Talgarth Road
08 August — 10 August Delays likely Lane closure 
Works description:CARRIAGEWAY RESURFACING 
Responsibility for works: Transport for London 

A4 West Cromwell Road 
07 August — 09 August Delays likely Lane closure 
Works location: Unknown Works description:TTS00184221/1- Planned works on behalf of TFL Pole removal with HIAB Responsibility for works: Transport for London 
A4 West Cromwell Road
07 August — 10 August Delays likely Traffic control (multi-way signals) 
Works description: Install 30m of 1 way poly duct in Footway 
Responsibility for works: Openreach 

A315 Hammersmith Road
30 July — 07 August Delays likely Lane closure 
Works description: LAY NEW DUCT IN FOOTWAY FOR A NEW CUSTOMER CONNECTION 
Responsibility for works: VIRGIN MEDIA 

317 North End Road
24 July — 21 August 
Delays likely Traffic control (multi-way signals) 
Works description: Arqiva 5G. Excavate footway and carriageway to install new duct 
Responsibility for works: Cityfibre Metro Networks

August 3, 2018