| A219 Fulham Palace Road, London, Hammersmith And Fulham |
| 08 June — 19 June Road closure |
Delays likely due to Streetworks
Anchor Installation. Full Closure Of Fulham Palace Road Northbound And Southbound. at A219 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
| A219 Queen Caroline Street, London, Hammersmith And Fulham |
| 08 June — 19 June Road closure |
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Queen Caroline Street With Agreed Diversion Route. at A219 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
| A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
| 08 June — 10 June Contra-flow |
Delays likely due to Streetworks
11/009 Tel3417 - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd5 Plus Feed To Existing Chamber (F/W 2m New Duct And Underkerb) Sb C/W Lane 1 Closed, Traffic Running In N/B Lane 2. Sb Lane 1 Open And F/W To Chamber (Ped Access Maintained) 10.00-15.00, Ped Access Maintained. Van And Additional Equipment Parked In Bay at A219 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
| A306 Hammersmith Bridge Road, London, Hammersmith And Fulham |
| 08 June — 19 June Road closure |
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Hammersmith Bridge Road Northbound And Southbound at A306 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
| A3220 Holland Road, London, Kensington And Chelsea |
| 09 June — 10 June Lane closure |
Delays likely due to Streetworks
Maintenance - Patch - Patch Cracked Cw Area 3m Sq Across Cw Lane 1 Switch Lane 2 Closure at A3220 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
| A4 West Cromwell Road, London, Hammersmith And Fulham |
| 09 June — 10 June Lane closure |
Delays likely due to Streetworks
11/017 Tel17633 - Access Pole 1, Red Lamp Out On A Phase. Cherry Picker Needed As 6m Pole. Work Will Take Approx. 30mins, 22:00-05:00, Ped Access Maintained. at A4 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
| A315 Kensington High Street, London, Kensington And Chelsea |
| 09 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
District Metering X-Bond - Surface B--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A315 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A3218 Lillie Road, London, Hammersmith And Fulham |
| 08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
Connections Small Service:New Service: (Approx Depth 450mm-600mm):Install 100amp Three Phase Supply at A3218 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
| A3219 Munster Road, London, Hammersmith And Fulham |
| 08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
Customer Side Leakage Supply Pipe Replacement at A3219 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A3220 Addison Road, London, Kensington And Chelsea |
| 09 June — 15 June Some carriageway incursion |
Delays possible due to Streetworks
Exc In Cw To Repair Blocked Gully at A3220 |
| Responsibility: Kensington and Chelsea Royal Borough Council |
| EToN status: Planned work about to start |
|
|
| A4020/A40 Shepherd'S Bush Green, London, Hammersmith And Fulham |
| 08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
Cabling Works (Splicing And Testing Of Fibre Optic Cables) To Be Carried Out On An Existing Footway Or Carriageway Boxes. at A4020/A40 |
| Responsibility: Global Crossing (UK) Telecommunications |
| EToN status: Planned work about to start |
|
|
| A4020 Uxbridge Road, London, Hammersmith And Fulham |
| 08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
Install New Tee In Footway To Connect New Client at A4020 |
| Responsibility: Virgin Media |
| EToN status: Planned work about to start |
|
|
| A402 Goldhawk Road, London, Hammersmith And Fulham |
| 08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
Interim To Permanent Reinstatement In Footway at A402 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
|
|
|
|
| Iffley Road, London, Hammersmith And Fulham |
| 08 June — 10 June Some carriageway incursion |
Delays possible due to Streetworks
- at - |
| Responsibility: Global Crossing (UK) Telecommunications |
| EToN status: Planned work about to start |
|