| A219 Fulham Palace Road, London, Hammersmith And Fulham |
| 20 July — 20 July Lane closure |
Delays likely due to Streetworks
Replace Sewer Cover--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A219 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A219 Fulham Palace Road, London, Hammersmith And Fulham |
| 20 July — 31 July Road closure |
Delays likely due to Streetworks
Anchor Installation. Full Closure Of Fulham Palace Road Northbound And Southbound. at A219 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
| A219 Queen Caroline Street, London, Hammersmith And Fulham |
| 20 July — 31 July Road closure |
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Queen Caroline Street With Agreed Diversion Route. at A219 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
|
| A306 Hammersmith Bridge Road, London, Hammersmith And Fulham |
| 20 July — 31 July Road closure |
Delays likely due to Streetworks
Local Strengthening Works. Full Closure Of Hammersmith Bridge Road Northbound And Southbound at A306 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
|
| A402 Goldhawk Road, London, Hammersmith And Fulham |
| 20 July — 22 July Traffic control (multi-way signals) |
Delays likely due to Streetworks
Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling Works In Existing Duct And Box Cleaning. Required For New Customer Connection at A402 |
| Responsibility: BT |
| EToN status: Planned work about to start |
|
|
| A4 Talgarth Road, London, Hammersmith And Fulham |
| 19 July — 21 July Lane closure |
Delays likely due to Streetworks
Tfl Maintenance Work - Install Loops And Piezo For Traffic Count Site, 3 Lanes E/B And 3 Lanes W/B at A4 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
| A4 West Cromwell Road, London, Hammersmith And Fulham |
| 20 July — 21 July Lane closure |
Delays likely due to Streetworks
11/017 Tel25097 - Pbu'S Require Replacing On Both Sides Of Crossing Poles 1, 4 And 7, 22:00-05:00, Ped Access Maintained. at A4 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
| B408 Askew Road, London, Hammersmith And Fulham |
| 20 July — 22 July Lane closure |
Delays likely due to Streetworks
Safe Access To Underground Bt Footway And Carriageway Boxes For Fibre Cabling Works In Existing Duct And Box Cleaning. Required For New Customer Connection at B408 |
| Responsibility: BT |
| EToN status: Planned work about to start |
|
|
| B408 Dalling Road, London, Hammersmith And Fulham |
| 20 July — 28 July Traffic control (multi-way signals) |
Delays likely due to Streetworks
Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 120055 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. at B408 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
| B408 Paddenswick Road, London, Hammersmith And Fulham |
| 20 July — 28 July Traffic control (multi-way signals) |
Delays likely due to Streetworks
Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 120055 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. at B408 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
|
|
| A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
| 20 July — 22 July Some carriageway incursion |
Delays possible due to Streetworks
Capital Programmes:Project::Excavation Of Joint Bays, Cable Installation And Reinstatement at A219 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
| A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
| 20 July — 23 July Some carriageway incursion |
Delays possible due to Streetworks
1x63mm Bp Metered New Water Suppy, 9m C/W In Carriageway. Our Intentionis To Complete The Permanent Reinstatement In The Same Phase at A219 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A306 Castelnau, Barnes, Richmond Upon Thames |
| 20 July — 22 July Some carriageway incursion |
Delays possible due to Streetworks
B Box Exchange >33mm Footway In Footway. Our Intention Is To Completethe Permanent Reinstatement In The Same Phase at A306 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A4020 Uxbridge Road, London, Hammersmith And Fulham |
| 19 July — 19 July Some carriageway incursion |
Delays possible due to Streetworks
Clear Blockage In Footway And Any Blockage If Found. Footway Works Only. at A4020 |
| Responsibility: Virgin Media |
| EToN status: Planned work about to start |
|
|
| B408 Askew Road, London, Hammersmith And Fulham |
| 20 July — 22 July Some carriageway incursion |
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at B408 |
| Responsibility: BT |
| EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|