| A219 Fulham Palace Road, London, Hammersmith And Fulham |
| 05 August — 07 August Some carriageway incursion |
Delays possible due to Streetworks
B Box Exchange In Footway. Our Intention Is To Complete The Permanentreinstatement In The Same Phase at A219 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A306 Castelnau, Barnes, Richmond Upon Thames |
| 05 August — 07 August Some carriageway incursion |
Delays possible due to Streetworks
Excavate To Clear Blockage In The Footway at A306 |
| Responsibility: Virgin Media |
| EToN status: Planned work about to start |
|
|
| A315/B408 Glenthorne Road, London, Hammersmith And Fulham |
| 04 August — 10 August Some carriageway incursion |
Delays possible due to Streetworks
Connections Highway Services:Works For Road Purposes: (Notice For Information Only):Discon Of Service To L/C On Behalf Of Lbhf at A315/B408 |
| Responsibility: Hammersmith and Fulham London Borough Council |
| EToN status: Planned work about to start |
|
|
| |
|
| A315 Hammersmith Road, London, Hammersmith And Fulham |
| 04 August — 06 August Some carriageway incursion |
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway at A315 |
| Responsibility: BT |
| EToN status: Planned work about to start |
|
|
| A315 King Street, London, Hammersmith And Fulham |
| 04 August — 04 August Some carriageway incursion |
Delays possible due to Streetworks
District Metering Miscellaneous Repair - Surface B--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A315 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A315 King Street, London, Hammersmith And Fulham |
| 04 August — 17 August Some carriageway incursion |
Delays possible due to Streetworks
Imga160061. Excavate And Replace 25m Of 150mm Di Gas Main Withnew125mmpe Pipe. Transfer Services To No 182, 184, 186, 188 Kingsstreet. at A315 |
| Responsibility: National Grid Gas Plc |
| EToN status: Planned work about to start |
|
|
|
|
| B408 Dalling Road, London, Hammersmith And Fulham |
| 04 August — 17 August Some carriageway incursion |
Delays possible due to Streetworks
Imga160061. In Conjunction With Works Taking Place In King Street. at B408 |
| Responsibility: National Grid Gas Plc |
| EToN status: Planned work about to start |
|
|
| |
|
| Coningham Road, London, Hammersmith And Fulham |
| 04 August — 10 August Some carriageway incursion |
Delays possible due to Streetworks
- at - |
| Responsibility: Hammersmith and Fulham London Borough Council |
| EToN status: Planned work about to start |
|
|
|
|
|