| A3220 Warwick Road, London, Kensington And Chelsea |
| 10 August — 18 September Traffic control (multi-way signals) |
Delays likely due to Streetworks
Signals - Tfl Traffic Signal Modernisation Works F/Way Works: Demolish & Re-Build 14x Chamber And Install 8x Nal Sockets + 1x Controller Nal Base. C/Way: Centre Island Works (Demolishing Phase To Take Place Week Days Off-Peak Hours @ 10:00-15:30hrs; Re-Building Phase To Take Place Week Nights @ 20:00-05:00hrs). Full Time Temporary Light With Ped Facilities To Be Used For The Duration Of Works at A3220 |
| Responsibility: Transport For London |
| EToN status: Advanced planning |
|
|
|
|
| A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
| 10 August — 12 August Some carriageway incursion |
Delays possible due to Streetworks
Capital Programmes:Project::Excavation Of Joint Bays, Cable Installation And Reinstatement at A219 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
| A315/B408 Glenthorne Road, London, Hammersmith And Fulham |
| 11 August — 13 August Some carriageway incursion |
Delays possible due to Streetworks
Boundary Box Remove In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at A315/B408 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
| A4 Talgarth Road, London, Hammersmith And Fulham |
| 11 August — 13 August Some carriageway incursion |
Delays possible due to Streetworks
Repair To A Damaged Network Valve In Footway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at A4 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|