Roadworks in the Hammersmith Area
Where to expect traffic delays in the days ahead
Road closures underneath Hammersmith Flyover
Centre Access Road
Road closure, 22:30-05:00, Mon 7 - Fri 11 Sept and Mon 14 - 18 Sept
Eastern Access Road
Road closure, 22:30-05:00, Mon 7 - Fri 11 Sept, and Mon 14 - Fri 18 Sept
Hammersmith Bridge Road
Northbound lane closure, 21:30 - 05:00, Mon 7 - Fri 11 Sept
Southbound lane closure, 21:30 - 05:00, Mon 7 - Fri 11 Sept
Talgarth Road
Westbound onto gyratory 2 lane closure, 21:30 - 05:00 Mon 7 - Fri 11 Sept
Eastbound entry slip narrowing, 24/7 ongoing
Westbound off-slip lane closure, 24/7 ongoing until Friday 11 Sept
Western Access Road
Road closure, 24/7 ongoing
A4 Talgarth Road |
08 September — 09 September Lane closure |
Delays likely due to Streetworks
Repair Failed Carriageway Lane 1 Closure - 2230 - 0500 at A4 |
Responsibility: Transport For London |
EToN status: Planned work about to start
|
A219 Hammersmith Broadway |
07 September — 09 September Lane closure |
Delays likely due to Streetworks
11/104 Tel15456 - Tm Only For - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd0 & Sd1 Plus Feed To Existing Chamber (F/W 2m New Duct And Underkerb) 23.00-05.00, Ped Access Maintained. Van And Additional Equipment Parked In Bay at A219 |
Responsibility: Transport For London |
EToN status: Planned work about to start
|
|
A219 Queen Caroline Street |
07 September — 09 September Lane closure |
Delays likely due to Streetworks
11/104 Tel15456 - Tm Only For - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd0 & Sd1 Plus Feed To Existing Chamber (F/W 2m New Duct And Underkerb) 23.00-05.00, Ped Access Maintained. Van And Additional Equipment Parked In Bay at A219 |
Responsibility: Transport For London |
EToN status: Planned work about to start
|
|
A315 Beadon Road |
07 September — 09 September Lane closure |
Delays likely due to Streetworks
11/104 Tel15456 - Tm Only For - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd0 & Sd1 Plus Feed To Existing Chamber (F/W 2m New Duct And Underkerb) 23-00-05.00, Ped Access Maintained. Van And Additional Equipment Parked In Bay at A315 |
Responsibility: Transport For London |
EToN status: Planned work about to start
|
|
A315 Hammersmith Road |
07 September — 09 September Lane closure |
Delays likely due to Streetworks
11/104 Tel15456 - Slot Cut C/W Sensor Loops To Repair Traffic Signals Sd0 & Sd1 Plus Feed To Existing Chamber (F/W 2m New Duct And Underkerb) Eastbound C/W Swapping Lane 1 & 2 & 3 And F/W To Chamber (Ped Access Maintained) 23.00-05.00, Ped Access Maintained. Van And Additional Equipment Parked In Bay at A315 |
Responsibility: Transport For London |
EToN status: Planned work about to start
|
|
A4 Talgarth Road |
07 September — 11 September Lane closure |
Delays likely due to Streetworks
Pedestrian And Road Safety Improvement Works - Lane 1 Switch To Lane 2 And 3 Closure Eb, Lane 1 Switch To Lane 2 And 3 Closure Wb, 22:00 To 05:00 Phase 1: Lane 1 Or 2 & 3 Eb, 2200-0500. 07-08 Sep, Phase 2: Lane 1 Or 2 & 3 Wb, 2200-0500. 08-09 Sep, Phase 3: Lane 1 Or 2 & 3 Eb, 2200-0500. 19-20 Aug, Phase 4: Lane 1 Or 2 & 3 Wb, 2200-0500. 10-11 Sep Works Must Be Coordinated With Remaining Hfo Works N1500712-001-W001 at A4 |
Responsibility: Transport For London |
EToN status: Planned work about to start
|
|
| A4 Great West Road |
| 01 September — 30 September Lane closure |
Delays likely due to Streetworks
Taper On Approach To Hammersmith Flyover Closure For Expansion Joint Installation Works, Waterproofing And Resurfacing Works. Also Includes So Work Around The West Abutment For Reinstatement Works. at A4 |
| Responsibility: Transport For London |
| EToN status: Advanced planning |
|
|
A219 Fulham Palace Road |
31 August — 11 September Road closure |
Delays likely due to Streetworks
Road Or Lane Closure Of Fulham Palace Road Northbound And Southbound. Part Of The Hammersmith Flyover Finishing Works That Include Reinstatement And Lighting Works. at A219 |
Responsibility: Transport For London |
EToN status: Planned work about to start
|
|
A219 Queen Caroline Street |
31 August — 11 September Road closure |
Delays likely due to Streetworks
Road Or Lanel Closures Of Queen Caroline Street With Agreed Diversion Route. Part Of The Hammersmith Flyover Finishing Works Which Include Reinstatement And Ligthing Works. at A219 |
Responsibility: Transport For London |
EToN status: Planned work about to start
|
|
A306 Hammersmith Bridge Road |
31 August — 11 September Road closure |
Delays likely due to Streetworks
Road Or Lanel Closures Of Hammersmith Bridge Road Northbound And Southbounda S Part Of Finishing Works Including Reinstatement And Lighting Works. at A306 |
Responsibility: Transport For London |
EToN status: Planned work about to start
|
Information supplied by Roadworks.org
September 8, 2015
|