| A219 Fulham Palace Road, London, Hammersmith And Fulham |
| 04 November — 04 November Traffic control (two-way signals) |
Delays likely due to Streetworks
S81 Planned Cover Replacement--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A219 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
|
| A3220 Warwick Road, London, Kensington And Chelsea |
| 04 November — 05 November Lane closure |
Delays likely due to Streetworks
Maintenance - Make Safe Leaning Electrical Post And Sign Damaged Lane 1 at A3220 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
| A402 Holland Park Avenue, London, Kensington And Chelsea |
| 04 November — 06 November Lane closure |
Delays likely due to Streetworks
Disconnect A Redundant Water Supply In Footway. Our Intention Is Tocomplete The Permanent Reinstatement In The Same Phase at A402 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
|
| A3219 Dawes Road, London, Hammersmith And Fulham |
| 05 November — 09 November Some carriageway incursion |
Delays possible due to Streetworks
Test 15m Of Existing Ducts To Locate Blockages at A3219 |
| Responsibility: BT |
| EToN status: Planned work about to start |
|
|
|
| A3220 Holland Road, London, Kensington And Chelsea |
| 05 November — 07 November Some carriageway incursion |
Delays possible due to Streetworks
Clear Blocked Duct In Footway To Connect New Client at A3220 |
| Responsibility: Virgin Media |
| EToN status: Planned work about to start |
|
|
|
| A3220 Warwick Road, London, Kensington And Chelsea |
| 04 November — 05 November Some carriageway incursion |
Delays possible due to Streetworks
Maintenance - Cracking Around Gully.Area 0.4m Sq Partial Lane 3 Closure Rhs / Partial Fw Closure at A3220 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
|
|
| B408 Paddenswick Road, London, Hammersmith And Fulham |
| 05 November — 09 November Some carriageway incursion |
Delays possible due to Streetworks
New Supply Following Installation Of Bus Shelter - Existing Permit Rk00300027729 at B408 |
| Responsibility: London Transport |
| EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
|