| A219 Fulham Palace Road, London, Hammersmith And Fulham |
| 17 November — 23 November Lane closure |
Delays likely due to Streetworks
Network Operations Maintenance:Install / Replace Link Box: (Approx Depth 450mm):Lb No. 130513 - A - Replace A Very Poor Condition Link Box In The Footway. Until The Excavation On A Link Box Is Complete We Are Unaware On Totally What We May Find. If Service Cables Are Found That Could Be To Blocks Of Flats, Businesses Or Houses Then We Need To, By Law Give All Customers 5 Days Notice That Their Electric Supply Will Be Interrupted For Up To 8 Hours. at A219 |
| Responsibility: UK Power Networks |
| EToN status: Planned work about to start |
|
|
|
|
|
| A306 Castelnau, Barnes, Richmond Upon Thames |
| 16 November — 18 November Traffic control (multi-way signals) |
Delays likely due to Streetworks
Lining (No Excavation) Of Defective Foul Water Sewer To Prevent Flooding Of Private Properties. at A306 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
|
|
|
| A4 Talgarth Road, London, Hammersmith And Fulham |
| 17 November — 17 November Lane closure |
Delays likely due to Streetworks
11/097 Tel50943 - Access Tfl Traffic Signal, Mast Arm Pole 4, Red Aspect Out. 02:00-05:00, W/B Lanes 4 And 5 at A4 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
| A4 Talgarth Road, London, Hammersmith And Fulham |
| 17 November — 18 November Lane closure |
Delays likely due to Streetworks
Remove Rotary Rig And All Equipment, Working For Optimise On Behalf Of Thames Water at A4 |
| Responsibility: Thames Water |
| EToN status: Planned work about to start |
|
|
|
|
|
| A315/B408 Glenthorne Road, London, Hammersmith And Fulham |
| 16 November — 16 November Some carriageway incursion |
Delays possible due to Streetworks
Connections Highway Services:Works For Road Purposes: (Notice For Information Only):Electrical Connection/Disconnection Of Lamp Column On Behalf Of Lbhf - Nicky Moody at A315/B408 |
| Responsibility: Hammersmith and Fulham London Borough Council |
| EToN status: Planned work about to start |
|
|
|
| A315 King Street, London, Hammersmith And Fulham |
| 17 November — 19 November Some carriageway incursion |
Delays possible due to Streetworks
Install 6m Of 1 Way Poly Duct In Footway at A315 |
| Responsibility: BT |
| EToN status: Planned work about to start |
|
|
|
|
|
| A3220 Warwick Road, London, Kensington And Chelsea |
| 17 November — 18 November Some carriageway incursion |
Delays possible due to Streetworks
Maintenance - Cracking Around Gully.Area 0.4m Sq Partial Lane 3 Closure Rhs / Partial Fw Closure at A3220 |
| Responsibility: Transport For London |
| EToN status: Planned work about to start |
|
|
|
| A402 Goldhawk Road, London, Hammersmith And Fulham |
| 16 November — 18 November Some carriageway incursion |
Delays possible due to Streetworks
Install 2m Of 1 Way Poly Duct In Footway And Core Drill Jointing Chamber at A402 |
| Responsibility: BT |
| EToN status: Planned work about to start |
|
|
|
| A4 West Cromwell Road, London, Kensington And Chelsea |
| 17 November — 18 November Some carriageway incursion |
Delays possible due to Streetworks
Excavate And Install New Fw Chamber On Existing Network And 20m 1x54mm Duct For New Customer Connection at A4 |
| Responsibility: Verizon Business |
| EToN status: Planned work about to start |
|
|
|
|
|
| Cathnor Road, London, Hammersmith And Fulham |
| 16 November — 20 November Traffic control (give & take) |
Delays possible due to Streetworks
- at - |
| Responsibility: National Grid Gas Plc |
| EToN status: Planned work about to start |
|