A219 Queen Caroline Street, London, Hammersmith And Fulham |
10 December — 11 December Some carriageway incursion |
|
|
Delays possible due to Streetworks
Remedial Works Following Defect Inspection - To Replace Temp Tarmac And Make Works Perm In Cwy at A219 |
|
|
Responsibility: National Grid Gas Plc |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A315 King Street, London, Hammersmith And Fulham |
11 December — 14 December Some carriageway incursion |
|
|
Delays possible due to Streetworks
Remedial Reinstatement - Replacing Slabs at A315 |
|
|
Responsibility: BT |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
A3220 Holland Road, London, Kensington And Chelsea |
10 December — 11 December Some carriageway incursion |
|
|
Delays possible due to Streetworks
Maintenance: Relay 9x Uneven Slabs Part F/Way Part Lane 1 at A3220 |
|
|
Responsibility: Transport For London |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A3220 Warwick Gardens, London, Kensington And Chelsea |
10 December — 11 December Some carriageway incursion |
|
|
Delays possible due to Streetworks
Horts - Fell Two Dangerous And Dying Trees To Plant New Ones This Year Partial Lane 1 Closure / Partial Fw Closure Part F/Way Part Lane 1 at A3220 |
|
|
Responsibility: Transport For London |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A4 West Cromwell Road, London, Kensington And Chelsea |
10 December — 11 December Some carriageway incursion |
|
|
Delays possible due to Streetworks
Maintenance: Relay Loose 900mm Slabs Part F/Way Part Lane 1 at A4 |
|
|
Responsibility: Transport For London |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
B317 North End Road, London, Hammersmith And Fulham |
10 December — 23 December Traffic control (priority working) |
|
|
Delays possible due to Streetworks
Excavate Footway And Carriageway To Install Ducting at B317 |
|
|
Responsibility: Virgin Media |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
B408 Dalling Road, London, Hammersmith And Fulham |
11 December — 15 December Some carriageway incursion |
|
|
Delays possible due to Streetworks
Boundary Box Adjust In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase at B408 |
|
|
Responsibility: Thames Water |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
|