Roadworks in the Hammersmith Area
Where to expect traffic delays in the days ahead
|
A219 Fulham Palace Road, London, Hammersmith And Fulham |
05 January — 11 January Lane closure |
|
|
Delays likely due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Nw London High Risk Link Box Replacement 2016 at A219 |
|
|
Responsibility: UK Power Networks |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
|
|
A306 Castelnau, Barnes, Richmond Upon Thames |
05 January — 05 January Lane closure |
|
|
Delays likely due to Streetworks
Replace Sewer Cover--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A306 |
|
|
Responsibility: Thames Water |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A3220 Warwick Road, London, Kensington And Chelsea |
05 January — 06 January Lane closure |
|
|
Delays likely due to Streetworks
Maintenance - Make Safe Leaning Electrical Post And Sign Damaged Lane 1 at A3220 |
|
|
Responsibility: Transport For London |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A4 Hammersmith Flyover, London, Hammersmith And Fulham |
05 January — 06 January Road closure |
|
|
Delays likely due to Streetworks
Cyclical Routine Maintenance And Epa Duties Full Closure & Diversions E/B at A4 |
|
|
Responsibility: Transport For London |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Information supplied by Roadworks.org
January 4, 2016
|