Roadworks in the Hammersmith Area


Where to expect traffic delays in the days ahead

A219 Fulham Palace Road, London, Hammersmith And Fulham

05 January — 11 January Lane closure

Delays likely due to Streetworks
Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Nw London High Risk Link Box Replacement 2016 at A219

Responsibility: UK Power Networks

EToN status: Planned work about to start

A219 Shepherd's Bush Road, London, Hammersmith And Fulham

04 January — 05 January Lane closure

Delays likely due to Streetworks
Interim To Permanent Reinstatement In The Carriageway at A219

Responsibility: Virgin Media

EToN status: Planned work about to start

A219 Shepherd's Bush Road, London, Hammersmith And Fulham

05 January — 05 January Contra-flow

Delays likely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at A219

Responsibility: BT

EToN status: Planned work about to start

A306 Castelnau, Barnes, Richmond Upon Thames

05 January — 05 January Lane closure

Delays likely due to Streetworks
Replace Sewer Cover--Works Intended To Include First Time Permanent Reinstatement Within Same Phase at A306

Responsibility: Thames Water

EToN status: Planned work about to start

A3220 Warwick Road, London, Kensington And Chelsea

05 January — 06 January Lane closure

Delays likely due to Streetworks
Maintenance - Make Safe Leaning Electrical Post And Sign Damaged Lane 1 at A3220

Responsibility: Transport For London

EToN status: Planned work about to start

A4 Hammersmith Flyover, London, Hammersmith And Fulham

05 January — 06 January Road closure

Delays likely due to Streetworks
Cyclical Routine Maintenance And Epa Duties Full Closure & Diversions E/B at A4

Responsibility: Transport For London

EToN status: Planned work about to start

A4 Hammersmith Flyover, London, Hammersmith And Fulham

05 January — 06 January Road closure

Delays likely due to Streetworks
Cyclical Routine Maintenance And Epa Duties Lane 3 W/B at A4

Responsibility: Transport For London

EToN status: Advanced planning

A4 West Cromwell Road, London, Hammersmith And Fulham

05 January — 06 January Lane closure

Delays likely due to Streetworks
Cyclical Routine Maintenance And Epa Duties Lanes 2&3 E/B. at A4

Responsibility: Transport For London

EToN status: Advanced planning

A4 West Cromwell Road, London, Kensington And Chelsea

05 January — 06 January Lane closure

Delays likely due to Streetworks
Cyclical Routine Maintenance And Epa Duties Lanes 2&3 E/B. at A4

Responsibility: Transport For London

EToN status: Advanced planning

Blythe Road, London, Hammersmith And Fulham

04 January — 12 January Traffic control (two-way signals)

Delays likely due to Streetworks
- at -

Responsibility: BT

EToN status: Planned work about to start

 

 

 

 

 


Information supplied by Roadworks.org

 

January 4, 2016

 

Related links

 

Related Links

Roadworks in the Hammersmith Area

Live Travel News for Hammersmith