A306 Castelnau, Barnes, Richmond Upon Thames |
18 January — 20 January Lane closure |
|
|
Delays likely due to Streetworks
Install 32m Of 1 Way Poly Duct In Footway,Provide 2 Core Drill(S) Into Jointbox Or Building at A306 |
|
|
Responsibility: BT |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A4 Great West Road, London, Hammersmith And Fulham |
18 January — 23 January Lane closure |
|
|
Delays likely due to Streetworks
Lane 1 Closure Under Tman N1501426-001-W001, To Asphalt The Footway Verge at A4 |
|
|
Responsibility: Transport For London |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A4 Hammersmith Flyover, London, Hammersmith And Fulham |
18 January — 23 January Lane closure |
|
|
Delays likely due to Streetworks
Lane 1 Closure Under Tman N1501426-001-W001, Needed For Footway Works On The Great West Road. at A4 |
|
|
Responsibility: Transport For London |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
B317 North End Road, London, Hammersmith And Fulham |
18 January — 29 January Lane closure |
|
|
Delays likely due to Streetworks
To Lay 500m Duct In Carriageway And 10m Duct In Footway. Build 2x Footway Boxes. at B317 |
|
|
Responsibility: Vodafone Group |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A219 Shepherd'S Bush Road, London, Hammersmith And Fulham |
19 January — 21 January Some carriageway incursion |
|
|
Delays possible due to Streetworks
Main Clamp In Footway. Our Intention Is To Complete The Permanentreinstatement In The Same Phase at A219 |
|
|
Responsibility: Thames Water |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
A3219 Munster Road, London, Hammersmith And Fulham |
19 January — 21 January Some carriageway incursion |
|
|
Delays possible due to Streetworks
Locate And Excavate 1 Blockage In Existing Duct at A3219 |
|
|
Responsibility: BT |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A3220 Holland Road, London, Kensington And Chelsea |
18 January — 18 January Some carriageway incursion |
|
|
Delays possible due to Streetworks
Thames Water Need To Carry Out Works On The Water Valve. A Road Narrowing System Will Be Installed To Allow These Works To Be Carried Out. Minor Works, No Excavation. at A3220 |
|
|
Responsibility: Thames Water |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
A402 Goldhawk Road, London, Hammersmith And Fulham |
19 January — 21 January Some carriageway incursion |
|
|
Delays possible due to Streetworks
Install 28m Of 1 Way Poly Duct In Footway,Install 2m Of 1 Way Poly Duct In Carriageway,Provide 1 Core Drill(S) Into Jointbox Or Building at A402 |
|
|
Responsibility: BT |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
B317 North End Road, London, Hammersmith And Fulham |
19 January — 19 January Some carriageway incursion |
|
|
Delays possible due to Streetworks
Install New Tee In Carriageway And Footway To Connect New Client at B317 |
|
|
Responsibility: Virgin Media |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
B350 Lonsdale Road, Barnes, Richmond Upon Thames |
18 January — 22 January Some carriageway incursion |
|
|
Delays possible due to Streetworks
130008036 Lay 2 New Single Supply'S And 1 Dual Supply To Site Withconnections To Existing Main In Footway/ Cut Off Old Supply. at B350 |
|
|
Responsibility: National Grid Gas Plc |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
B350 Lonsdale Road, Barnes, Richmond Upon Thames |
19 January — 25 January Some carriageway incursion |
|
|
Delays possible due to Streetworks
Install 130m Of 1 Way Poly Duct In Footway at B350 |
|
|
Responsibility: BT |
|
|
EToN status: Planned work about to start |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|