A315 King Street, London, Hammersmith And Fulham |
16 February — 18 February |
|
|
Delays likely Lane closure |
|
Works location: A315 |
|
|
Works description: Sewer S81 Emergency--Works Intended To Include First Time Permanent Reinstatement Within Same Phase |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
B317 North End Road, London, Hammersmith And Fulham |
15 February — 16 February |
|
|
Delays likely Road closure |
|
Works location: B317 |
|
|
Works description: Surfacing Carriageway |
|
|
Responsibility for works: Hammersmith and Fulham London Borough Council |
|
|
Current status: Advanced planning |
|
|
|
|
A219 Shepherd's Bush Road, London, Hammersmith And Fulham |
15 February — 15 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: A219 |
|
|
Works description: Underground Survey To Be Carried Out Os 186-188 In Parking Bays For Above Ground Survey And Investigation Study, Working For Optimise On Behalf Of Thames Water |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
A219 Wood Lane, London, Hammersmith And Fulham |
16 February — 18 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: A219 |
|
|
Works description: J/W Bulwer Street, Footway Repairs |
|
|
Responsibility for works: Hammersmith and Fulham London Borough Council |
|
|
Current status: Planned work about to start |
|
|
|
|
A306 Castelnau, Barnes, Richmond Upon Thames |
15 February — 17 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: A306 |
|
|
Works description: Main Clamp 0 To 6" Footway In Footway. Our Intention Is To Complete Thepermanent Reinstatement In The Same Phase |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
A315 Hammersmith Road, London, Hammersmith And Fulham |
15 February — 17 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: A315 |
|
|
Works description: By The Bus Cage Do The Marking On Bus Cage (H Blacktopundulation In Bs (H602) |
|
|
Responsibility for works: Hammersmith and Fulham London Borough Council |
|
|
Current status: Planned work about to start |
|
|
|
|
A315 King Street, London, Hammersmith And Fulham |
16 February — 18 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: A315 |
|
|
Works description: Cw. 1x1 Patch (H Blacktop: Potholes > 25mm) |
|
|
Responsibility for works: Hammersmith and Fulham London Borough Council |
|
|
Current status: Planned work about to start |
|
|
|
|
A315 King Street, London, Hammersmith And Fulham |
16 February — 18 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: A315 |
|
|
Works description: W.R.P. - Upgrade To Shelter Foundation, For And On Behalf Of Transport For London- Shelter 0113/0164 |
|
|
Responsibility for works: London Transport |
|
|
Current status: Planned work about to start |
|
|
|
|
A3219 Munster Road, London, Hammersmith And Fulham |
15 February — 19 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: A3219 |
|
|
Works description: Connections Small Service:New Service: (Approx Depth 450mm-600mm):Install New 100 Amp 3 Phase Service |
|
|
Responsibility for works: UK Power Networks |
|
|
Current status: Planned work about to start |
|
|
|
|
A3220 Warwick Road, London, Kensington And Chelsea |
15 February — 19 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: A3220 |
|
|
Works description: To Excavate And Locate Exisiting Electricity Cables. To Main Lay 4m Of 185mm Lv Wf. Service Connection 1 X Live Lv Connection To Ukpn Network. All Works Within The Footway. |
|
|
Responsibility for works: Gas Transportation Co Ltd |
|
|
Current status: Planned work about to start |
|
|
|
|
A4 West Cromwell Road, London, Kensington And Chelsea |
15 February — 17 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: A4 |
|
|
Works description: Excavate And Install New Fw Chamber On Existing Network And 2m 1x54mm Duct For New Customer Connection. F/W Works Only |
|
|
Responsibility for works: Verizon Business |
|
|
Current status: Planned work about to start |
|
|
|
|
B408 Paddenswick Road, London, Hammersmith And Fulham |
15 February — 22 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: B408 |
|
|
Works description: Network Operations Faults:Install / Replace Link Box: (Approx Depth 450mm):Lb 120933-Replace A Very Poor Condition Link Box In The Footway. |
|
|
Responsibility for works: UK Power Networks |
|
|
Current status: Planned work about to start |
|
|
|
|
Blythe Road, London, Hammersmith And Fulham |
16 February — 17 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: BT |
|
|
Current status: Planned work about to start |
|
|
|
|
Iffley Road, London, Hammersmith And Fulham |
16 February — 17 February |
|
|
Delays possible Some carriageway incursion |
|
Works location: - |
|
|
Works description: - |
|
|
Responsibility for works: Virgin Media |
|
|
Current status: Planned work about to start |
|
|
|