A315 Studland Street, London, Hammersmith And Fulham |
26 July — 27 July |
|
|
Delays likely Road closure |
|
Works location: A315 |
|
|
Works description: S81 Cover Replacement - Works Intended To Include First Time Permanent Within Same Phase |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
A4 Hammersmith Flyover, London, Hammersmith And Fulham |
25 July — 27 July |
|
|
Delays likely Road closure |
|
Works location: A4 |
|
|
Works description: Night Rolling Road Block Closure Of The Hammersmith Flyover Westbound Carriageway To Carry Out Co2 Testing. No Diversion Required And The Rolling Closure Will Maintain Speed Of Approx. 10mph |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Planned work about to start |
|
|
|
|
A4 Hammersmith Flyover, London, Hammersmith And Fulham |
25 July — 28 July |
|
|
Delays likely Road closure |
|
Works location: A4 |
|
|
Works description: Night Closure Of The Hammersmith Flyover Westbound Carriageway (To Carry Out Co2 Testing) - Hammersmith Gyratory Used As A Diversion Route. |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Planned work about to start |
|
|
|
|
A4 Talgarth Road, London, Hammersmith And Fulham |
25 July — 28 July |
|
|
Delays likely Road closure |
|
Works location: A4 |
|
|
Works description: Night Time Works. Talgarth Road Closure Of Westbound Carriageway Prior To The Hammersmith Flyover To Carry Out Co2 Testing - Hammersmith Gyratory Used As A Diversion Route. |
|
|
Responsibility for works: Transport For London |
|
|
Current status: Planned work about to start |
|
|
|
|
A4 Talgarth Road, London, Hammersmith And Fulham |
26 July — 28 July |
|
|
Delays likely Lane closure |
|
Works location: A4 |
|
|
Works description: Working On Behalf Of Thames Water� - Cut And Cap - C/W |
|
|
Responsibility for works: Thames Water |
|
|
Current status: Planned work about to start |
|
|
|
|
B408 Askew Road, London, Hammersmith And Fulham |
25 July — 29 July |
|
|
Delays likely Traffic control (multi-way signals) |
|
Works location: B408 |
|
|
Works description: Trench Across Carriageway For New Cctv Ducting |
|
|
Responsibility for works: Hammersmith and Fulham London Borough Council |
|
|
Current status: Planned work about to start |
|
|
|
|
|
Information supplied by Roadworks.org
July 25, 2016
|