Roadworks in the Hammersmith Area


Where to expect traffic delays in the days ahead

A315 King Street, London, Hammersmith And Fulham

09 May — 12 May

Delays likely Traffic control (two-way signals)

Works location: A315

Works description: 1x25mm Mdpe New Water Meter Supply F/Way And In Carriageway. Ourintention Is To Complete The Permanent Reinstatement In The Same Phase

Responsibility for works: Thames Water

Current status: Planned work about to start

Margravine Gardens, London, Hammersmith And Fulham

08 May — 08 May

Delays likely Traffic control (Stop/Go boards)

Works location: -

Works description: -

Responsibility for works: Thames Water

Current status: Planned work about to start

 

Information supplied by Roadworks.org

May 8, 2017  

Related links
Related Links

Roadworks in the Hammersmith Area

Live Travel News for Hammersmith