Roadworks in the Hammersmith Area
Where to expect traffic delays in the days ahead
A219 Butterwick, London, Hammersmith And Fulham |
31 July — 04 August |
|
|
Delays likely Lane closure |
|
Works location: A219 |
|
|
Works description: Network Operations Distribution:Install 11kv Hv Cables:6 X Hv Straight Joints + 1.5m Cable To Be Installed. 1m To Be Maintained In The F/W And 9.3m To Be Maintained In The C/W. |
|
|
Responsibility for works: UK Power Networks |
|
|
Current status: Planned work about to start |
|
|
|
|
A315 Hammersmith Road, London, Hammersmith And Fulham |
31 July — 04 August |
|
|
Delays likely Lane closure |
|
Works location: A315 |
|
|
Works description: Network Operations Distribution:Install 11kv Hv Cables:2 X Hv Straight Joints And 1 Pot End. Lane Closure Required 1m To Be Maintained In The Foot Way 6.8m In The C/W. |
|
|
Responsibility for works: UK Power Networks |
|
|
Current status: Planned work about to start |
|
|
|
|
|
|
|
|
Information supplied by Roadworks.org