Where to expect traffic delays in the days ahead
A219 Queen Caroline Street
16 - 18 July Delays likely Lane closure
Works description:MANHOLE COVER INSPECTION
Responsibility for works: THAMES WATER
A315 King Street
16 - 21 July Delays likely Traffic control (give & take)
Works description: DSLAM STREET CABINET & POWER INSTALLATION plus PCP RESHELL. Excavate to lay BT ducts, Lay concrete plinth, Stand cab. Excavate to expose low voltage cable for Power Connection and lay duct. POWER engineer to carry out inspection prior to jointing. POWER jointing team to insert cable and execute jointing works. Reinstate, Check and clear site.
Responsibility for works: Openreach
Blythe Road
17 - 20 July Delays possible Some carriageway incursion
Works description: H KERB TUR (H KERB/CHANNEL BLOCK ALIGNMENT)
Responsibility for works: Hammersmith and Fulham
Hammersmith Grove
17 - 20 July Delays possible Some carriageway incursion
Works description: CUSTOMER SIDE LEAKAGE REPAIR
Responsibility for works: THAMES WATER
July 16, 2018
Information supplied by Roadworks.org
July 16, 2018
|