Forthcoming Roadworks in Hammersmith


Where to expect delays and closures in days ahead

 

 

Sinclair Road, London, Hammersmith and Fulham
16 January — 16 January
Delays likely Traffic control (Stop/Go boards)
Works location: Unknown
Works description: Replace Sewer Cover--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026002141FNPM--000001

B408 Dalling Road, London, Hammersmith and Fulham
14 January — 15 January
Delays likely Traffic control (Stop/Go boards)
Works location: Unknown
Works description: Install 16m of 1 way poly duct in Footway,Install 5m of 1 way poly duct in Carriageway,Provide 3 core drill(s) into jointbox or building
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC006TI001LC500267815405

 

Great West Road, London, Hammersmith and Fulham
14 January — 15 January
Delays likely Lane closure
Works location: Unknown
Works description: Footway Patching repairs
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG430349708

A219 Shepherd's Bush Road, London, Hammersmith and Fulham
14 January — 16 January
Delays possible Some carriageway incursion
Works location: Unknown
Works description: THESE WORKS ARE FOR THE UPGRADING OF THE EXISTING ANTENNAS ACCES IS VIA AN ACCESS TOWER
Responsibility for works: O2 (UK) Limited
Current status: Planned work about to start
Works reference: MG08713539-CAM-WK03A

 

Gunterstone Road, London, Hammersmith and Fulham
11 January — 16 January
Delays possible Some carriageway incursion
Works location: Unknown
Works description: new water supply. 91, Plot 1, 1x50mm MDPE mtrd Supply. works in footwayand in Carriageway. Our intention is to complete the PermanentReinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU307000805030900040-001

 


Hammersmith Grove, London, Hammersmith and Fulham
02 January — 20 January
Delays possible Some carriageway incursion
Works location: Unknown
Works description: CONSTRUCTION OF A MINI PUMPING STATION (FLIP) IN THE FOOTWAY & CARRIAGEWAY
Responsibility for works: THAMES WATER
Current status: Advanced planning
Works reference: MU895MGJV/FLIPS/201594

 

 


 

 

 

 

Information supplied by roadworks.org

Related links
Related Links

Roadworks in the Hammersmith Area

Live Travel News for Hammersmith