Forthcoming Roadworks in Hammersmith
Where to expect diversions and delays
| A219 Fulham Palace Road, London, Hammersmith and Fulham |
| 16 July — 16 July |
| Delays likely Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: S81 PLANNED COVER REPLACEMENT--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
| Responsibility for works: THAMES WATER |
| Current status: Planned work about to start |
| Works reference: MU026002141DFMC--000003 |
|
|
| A219 Fulham Palace Road, London, Hammersmith and Fulham |
| 17 July — 23 July |
| Delays likely Lane closure |
| Works location: Unknown |
| Works description: TO LAY A NEW GAS SERVICE PIPE TO AN EXISTING PROPERTY |
| Responsibility for works: Cadent |
| Current status: Planned work about to start |
| Works reference: AZ0071000844647 |
|
| B317 North End Road, London, Hammersmith and Fulham |
| 15 July — 17 July |
| Delays likely Traffic control (multi-way signals) |
| Works location: Unknown |
| Works description: TO LOCATE AND EXCAVATE TO CLEAR BLOCKAGES ON EXISTING BT UNDERGROUND INFRASTRUCTURE AND TO ACCESS MANHOLES FOR GULLY SUCKING/DESILTING AND LAYING NEW TRACK |
| Responsibility for works: Openreach |
| Current status: Planned work about to start |
| Works reference: BC005KN1W000000FLMHM-NS2 |
| Distillery Road, London, Hammersmith and Fulham |
| 17 July — 17 July |
| Delays likely Road closure |
| Works location: Unknown |
| Works description: Road closure to facilitate installation of a piling rig at Tideway site (Development Consent Order powers are being used) |
| Responsibility for works: THAMES TIDEWAY TUNNEL LTD |
| Current status: Advanced planning |
| Works reference: ZE40500000346 |
Information supplied by roadworks.org
|