Where to expect diversions and delays
A219 Fulham Palace Road, London, Hammersmith and Fulham
29 October — 31 October
Delays likely - Contra-flow
Works location: Unknown
Works description: interim to perm propose in carriageway
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SCLJBU/6795580/ER1
A219 Fulham Palace Road, London, Hammersmith and Fulham
30 October — 01 November
Delays likely - Lane closure
Works location: Unknown
Works description: Non excavation - Small boom lift to be used to gain access to the to telecommunications on the front of 411 Fulham Palace Rd, Fulham, London SW6 6SX for essential maintenance. Lane closure to be in place while works are carried out.
Responsibility for works: O2 (UK) Limited
Current status: Planned work about to start
Works reference: MG08513653-PGN/ERF
Caithness Road, London, Hammersmith and Fulham
30 October — 01 November
Delays likely - Road closure
Works location: Unknown
Works description: Permit for TM purposes only - in collaboration with MU301000030998176-001
Responsibility for works: THAMES WATER
Current status: Advanced planning
Works reference: MU301000030998175-1001
Holcombe Street, London, Hammersmith and Fulham
29 October — 01 November
Delays likely - Road closure
Works location: Unknown
Works description: Access required to Underground BT structure to repair service - No structural changes. Work being carried out on existing BT Plant
Responsibility for works: Openreach
Current status: Planned work about to start
Works reference: BC005CC1W0019AUGIBYRM2NK
Baron's Court Road, London, Hammersmith and Fulham
30 October — 01 November
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: Service Pipe Repair <33mm Cway in Carriageway. Our intention is tocomplete the Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000031354408-002
Blythe Road, London, Hammersmith and Fulham
30 October — 01 November
Delays possible - Some carriageway incursion
Works location: Unknown
Works description: Valve Repack 0 to 6" Cway in Carriageway. Our intention is to completethe Permanent Reinstatement in the same phase
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU301000030998176-001
Information supplied by one.network
|